Öksüt

Öksüt is Stratex's latest high-sulphidation (HS) gold discovery in Central Anatolia, located 25 km south of Develi and 70 km south of Kayseri. The 109.4 km2 licence area is hosted within Miocene andesitic lava domes and pyroclastics, with units showing structurally controlled alteration, predominantly silicification and advanced argillic alteration.

oksutfig1.jpg

Figure 1. Early drilling at the Ortaçam zone, looking to the south.

Under the terms of a joint venture agreement with Centerra, Centerra is currently funding exploration at Öksüt. Centerra has met its initial earn-in expenditure of US$3 million to gain 50% of the project, which included 4,600 m diamond drilling, and is now earning an additional 20% interest in the project by funding an additional US$3 million of exploration expenditures on the property within the next two years.

Following the 2010 drilling programme, a total resource of 317,256 oz Au was defined within two of the six key zones identified, the main Ortaçam zone (Fig. 1, Fig. 2, Table. 1) and the Ortaçam North zone (Fig. 2, Table. 2). Following the 2011 drilling programme, an increased resource of 1,047,872 oz Au, in the Indicated and Inferred catergories, was calculated by Wardell Armstrong International, including 563,085 oz oxide Au (Table. 5) that is likely to be amenable to open-pit mining and heap-leach recovery. 

Table 1. Ortaçam Zone Mineral Resource Estimate using a 0.2 g/t Au cut-off

Resource Category Oxide Sulphide Total

Indicated

Tonnage (kt)

3,654

1,818

5,472

Au (g/t)

1.16

0.69

1.00

Metal

(oz)

136,558

40,123

176,681

Inferred

Tonnage (kt)

2,738

2,764

5,502

Au (g/t)

0.76

0.52

0.64

Metal

(oz)

66,830

46,217

113,047

 

Indicated + Inferred

Tonnage (kt)

6,392

4,582

10,974

Au (g/t)

0.99

0.59

0.82

Metal

(oz)

203,388

86,340

289,728

 

Table 2. Ortaçam North Zone Mineral Resource Estimate using 0.2 g/t Au cut-off

ResourceCategory Oxide  Sulphide  Total

Inferred

Tonnage (kt)

8,525

4,342

 12,867

Au (g/t)

1.31

2.85

 1.83

Metal

(oz)

359,697

398,447

 758,144

 

Oksutfig2.jpg 

Figure 2. Targets identified by rock-chip sampling at Öksüt.

To date, fifty-seven drill holes have been completed for a total of 13,835.10 m and the results are summarised in Tables 3, 4 and 5. Early drilling showed that the mineralization at Ortaçam is largely confined to steeply inclined breccia zones, with outcropping silica representing more extensive upper parts of breccia zones that taper at depth.

On-going drilling at Ortaçam North (Fig. 3) has confirmed that it comprises a number of relatively high-grade gold-bearing breccia pipes over an area of 350 metres x 250 metres, within a wider zone of less-well mineralised and altered breccia and volcaniclastic rocks up to 500 metres in diameter. Alteration and brecciation are estimated to extend down to a vertical depth of at least 420 metres. Best intersections include 268.00 m @ 2.34 g/t including 185.50 m @ 3.19 g/t and 59.20 m @ 5.39 g/t Au; 234.40 m @ 2.08 g/t Au, 220.20 m @ 1.83 g/t Au; 199.60 m @ 2.06 g/t including 60.30 m @ 4.7 g/t; and 116.00 metres @ 1.10 g/t Au.

The western and northern margins of the breccia pipe remain open and will be drill-tested, along with the wider licence area, during the 2012 drill programme, which is due to commence Q2-2012 (Fig. 4 and Fig. 5).

Intersections across this pipe are characterised by being predominantly oxide material, with only minor sulphide (mostly pyrite) present in some clasts of material resulting from the explosive brecciation of earlier mineralisation. Recent re-logging of the core, combined with the low sulphur contents determined by chemical analysis, reaffirm that the pyrite content is generally much less than 1%. Near-complete oxidation, extending down to at least 420 metres vertically, is likely to be an important factor in the future exploitation of the deposit.

Preliminary investigation of the leaching characteristics of the gold-bearing material was undertaken by submitting samples previously assayed for gold for repeat analysis using a cyanide-leach method. Oxide material containing no appreciable pyrite yielded recoveries averaging 92% and samples of transition material (containing minor pyrite) returned recoveries averaging 78%. Although this preliminary work can only be regarded as providing a general indication of possible recoveries and needs to be substantiated with detailed metallurgical test work in the future, the results do suggest that both oxide and transition material should be amenable to processing by heap leaching.

Table 3. First-phase drilling results

Hole Dip From (m) To (m) Length (m) Au (g/t)
ODD-1 -075° No significant intersection
ODD-2 -075° 0.80 20.10 19.30 2.96
ODD-3 -075° 14.75 77.20 62.45 2.16
ODD-4 -075° 71.80 145.10 73.30 1.36
ODD-5 -075° No significant intersection
ODD-6 -045° 0.00 171.70 171.70 0.51
ODD-7 -045° 7.30 113.00 105.70 0.59
ODD-8 -045° 0.00 270.20 270.20 1.22
including   0.00 45.50 45.50 1.58
including   77.00 117.70 40.70 2.77
including   224.60 262.80 38.20 2.94
including   226.40 234.50 8.10 10.23
ODD-9 -045° No significant intersection
ODD-10 -045° Discontinuous intersections >0.2 g/t
ODD-11 -045° 0.00 15.70 15.70 1.82
and   111.00 204.40 93.40 0.37
ODD-12 -045° 0.00 93.60 93.60 5.61
and   169.70 196.50 26.80 1.05
ODD-13 -045° No significant intersection
ODD-14 -045° 0.00 93.80 93.80 0.26
including   20.00 35.50 15.50 0.75
ODD-15 -045° 0.00 138.00 138.00 0.26
and   173.50 213.50 39.60 0.31
ODD-16 -060° 4.75 47.10 42.35 2.03
including   10.10 27.50 17.40 3.00
ODD-17 -045° 41.50 92.50 51.00 1.74
including   47.50 71.50 24.00 3.02 (high-grade zone)
ODD-18A -050° 0.00 30.30 30.30 1.61
ODD-19 -045° 0.00 34.65 34.65 2.26
including   6.70 27.90 21.20 3.48 (>0.4 g/t)
ODD-20 -045° 0.00 80.30 80.30 2.22
including   25.10 37.10 12.00 6.49 (high-grade zone)
ODD-21 -045° No significant intersection

*All intersections are with cut-off grade at 0.2 g/t Au unless otherwise stated.

Table 4. 2010 drilling results

Hole Zone Dip From (m) Length1 (m) Au (>0.2 g/t) Cu (>0.1%)
          Oxide Sulphide  
ODD-22 Büyükmese -045° 162.70 5.10 0.44    
ODD-23 Ortaçam N -045° 2.60 42.90 0.65    
ODD-24 Ortaçam N -045° 37.80 18.70 0.21    
ODD-25 Büyükmese -045° No significant intersection
ODD-26 Ortaçam N -045° 20.30 104.70 0.49    
ODD-27 Devetasi W -060° No significant intersection
ODD-28A Ortaçam N -045° 4.70 47.30 0.54    
and     118.00 10.70 1.62    
and     156.80 6.10 2.83    
and     175.70 23.30 0.35    
ODD-29 Ortaçam SW -70 16.90 15.10 0.24    
and 162.00   162.00 13.00   2.28  
and     222.40 4.85   0.49  
ODD-30 Ortaçam W -045° 0.00 6.20 0.27    
and     14.10 19.70 0.24    
and     189.00 13.20   0.41  
ODD-31 Ortaçam SW -045° 7.30 50.20 0.84    
and     60.50 48.00     0.14
ODD-32 Ortaçam SW -070° No significant intersection
ODD-33 Ortaçam SW -045° 0.00 31.20 0.37    
and     41.40 22.40 1.50    
and     63.80 6.30   1.77  
and     72.20 64.40   0.57  
and     68.60 68.00     0.58
Total     0.00 136.60 0.69* Oxide + sulphide
and     239.60 13.50 0.27    
ODD-34 Ortaςam SW -045° 46.40 49.10   0.41 0.17
and     108.50 76.10 0.63    
including     131.80 52.80     0.10
ODD-35 Ortaςam W -045° 0.00 30.60 0.62*    
ODD-36 Ortaςam W -045° 1.50 38.50 0.34    
and     56.50 12.90 0.42    

1 Length not necessarily representative of true thickness.

Table 5. 2011 drilling results

Hole Zone Dip From (m) Length1 (m) Au (>0.2 g/t) Cu (>0.1%)
          Oxide Sulphide  
ODD-37 Ortaςam W -060° 188.50 9.50   1.84  
including     188.50 7.10   1.06 0.17
ODD-38 Ortaςam SW -045° 2.50 32.30 0.34    
and     93.50 40.80 0.88    
and     141.50 116.50 0.28    
and     275.00 8.00   0.51  
ODD-39 Ortaςam SW -050° No significant intersection
ODD-40 Ortaςam SW -045° 76.35 6.15 0.23    
ODD-41 Ortaςam W -045° 25.40 12.60 0.21    
and     176.60 24.30   0.41  
ODD-42 Kızılağıl -060° 27.90 9.00 0.51    
and     58.00 2.00 0.60    
and     65.00 9.50 0.36    
and     83.50 8.50 0.62    
ODD-43 Kızılağıl -060° 18.40 41.90 0.29    
ODD-44 Ortaςam SW -065° 46.50 7.10 0.37    
and     153.50 25.50   0.44  
and     190.00 11.00   0.24  
ODD-45 Ortaςam N -045° 42.30 234.40 2.082    
including     145.00 72.50 4.432    
also     289.00 13.40 0.47    
also     317.40 5.00 0.30    
and     307.40 26.00     0.78
ODD-46 Ortaςam N -045° Hole stopped
ODD-47 Ortaςam N -045° 142.00 8.00 0.32    
and     162.00 5.60 0.37    
and     196.40 102.70 0.74    
ODD-48 Ortaςam N -050° 44.00 220.20 1.832    
including     161.70 66.70 3.132    
ODD-49 Ortaςam N -050° 67.00 116.00 1.102    
including     137.00 28.40 1.742    
ODD-50 Ortaςam N -050° 77.10 9.90 0.232    
and     251.30 7.00 0.432    
and     336.00 13.70 0.332    
ODD-51 Ortaςam N -050° 27.30 250.10 0.472    
including     27.30 105.70 0.722    
ODD-52 Ortaςam N -050° 31.90 12.60 0.342    
and     107.50 199.60 2.062    
including     107.50 60.30 4.702    
and     326.10 47.40 0.302    
and     389.00 14.00 0.332    
and     416.00 9.00 0.332    
ODD-53  Kuςukmese -45° 213.40  6.80  0.90     
ODD-54  Ortaςam N  -45° 52.50  19.20  0.33    
and     141.20  21.20  0.32     
ODD-55  Ortaςam N  -050° 86.50  268.00  2.34     
including      86.50  185.50  3.19     
and      188.50  59.20  5.39     
ODD-56      Ortaςam N  -050° 83.30  173.80  0.70     
including      155.50 15.80  1.48     
and        178.20  23.70  1.84     
ODD-57    Ortaςam N    -050° 19.40  16.60  0.55     
including        72.80  5.20  0.73     
and      94.50  229.10  1.02     
and      133.00  28.90  2.49     

1 Length not necessarily representative of true thickness. 2 Includes minor sulphide in places

* ODD-33 - includes 10 m <0.2 g/t Au; ODD-35 - includes 3 m of mixed oxide-sulphide

 

Ortacam drill map

Figure 3. Drill plan of the Ortaçam North Zone.

OD45 cross section

Figure 4. Provisional interpretation of Ortaçam North Zone: N-S cross-section

ODD55 cross section 

Figure 5. Provisional interpretation of Ortaçam North Zone: SW - NE cross-section


© 2012 Stratex International Plc. AIM Listed - Reg in England & Wales no. 5601091. VAT number (GB-867 6044 93).

Stratex International Plc, 180 Piccadilly, London, W1J 9HF
Tel: +44 (0)207 830 9650    Fax: +44 (0)207 830 9651

Site map | Privacy policy | Terms of use

Powered by MADISONSOHO